TEAM Architects Napier

Hastings Intermediate School – Performing Arts Centre

Location Hastings
Studio TEAM Architects Napier

Opening it’s doors in 1954, Hastings Intermediate was the first intermediate school in the area.  A devastating fire in February 2006 destroyed the original 1950s school hall but this presented an opportunity for a modern replacement building to take it’s place.

JDTA’s design for an inspiring multi-purpose Performing Arts Centre incorporates facilities for Music, Drama and Physical Education.  As the new building is located at the front of the School, this has allowed  for an imposing and striking frontage to be added.  This provides a connection to the local community with the prospect of public usage whilst maintaining appropriate links to the School grounds.